statik

STATIK Step by Step: A Worked Example for a Support Team

Table of Contents

Short answer. STATIK is eight steps you run on one service: what it is for, what hurts, what work arrives, what the team can finish, how work flows, which classes of service exist, how the board works, and who agrees to try it. In the example below, a six-person support team sees 30 requests a week against 24 finished, so its queue grows by 6 a week. The steps lead to a board with 16 items in progress at most (down from 31), which cuts average cycle time from about 6.5 to about 3.3 working days. The limit alone does not close the gap; the demand numbers do. All figures are an illustrative example, not real data.

Written by the AgileFever editorial team. Facts checked on November 18, 2026 against the official pages of the organizations named in this post. AgileFever sells training for some of the topics covered here, and we say so wherever it applies. Step names follow David J. Anderson’s school; the Kanban measures follow the Kanban Guide. The team, numbers and board in this post are an illustrative example.

Most explanations of STATIK stop at a list of step names. This post runs the method once, on one invented service desk, so you can see what each step produces and how the numbers from early steps decide the board you draw at the end. If you want the definition first, read what STATIK is and where it comes from. If you want to know what a team session delivers and how to schedule one, read STATIK workshop for teams. This post goes after both: it shows the working.

STATIK step by step: the eight steps and the example we will use

STATIK stands for Systems Thinking Approach to Introducing Kanban. Kanban University’s workshop description, checked on November 18, 2026, groups the work into understand, analyse and design, and says the course runs one day with no exam. Sources count the steps differently: Kanban University’s own article speaks of six basic steps, a Russian-language write-up uses seven, and David J. Anderson’s school lists eight. We use the eight because they separate jobs that you do in different meetings. They are iterative, so expect to loop back.

Step Question it answers What our example team writes down
1. Fit for purpose What does the customer need from this service? Service definition and 4 fitness criteria
2. Sources of dissatisfaction What hurts, inside and outside the team? Ranked pain list with one real item each
3. Analyse demand What work arrives, how much, how urgent? Demand table: 4 work types, 30 a week
4. Analyse capability What does the team finish, and how fast? Throughput 24 a week, cycle times, WIP of 31
5. Model the workflow What states does work pass through? Five states with waits marked
6. Discover classes of service Which work needs different handling? Four classes with rules
7. Design the Kanban system Board, limits, policies, cadences Board with a 16 item limit and written policies
8. Socialize the design Who must agree, and for how long? Six week trial with two reviews

The example. An internal IT support team of six serves about 400 employees. It handles four kinds of work: access and password requests, hardware and software requests, incidents, and onboarding of new joiners. The team has an issue tracker and eight weeks of closed tickets. Everything that follows about this team is made up to show the method. Your numbers will differ, and the method is the part to copy.

Steps 1 and 2: fit for purpose and sources of dissatisfaction

Step 1 is a short conversation with the people the team serves. Our team writes: “Employees can do their work on working equipment and with the access they need.” Then it asks which qualities matter to those employees and gets four fitness criteria: access requests finish within 2 days, hardware within 5, incidents within 3, and onboarding is ready two days before a start date.

Step 2 collects what hurts. The David J. Anderson school separates internal sources (what slows the team) from external ones (what customers say) and asks the team to link them. The links are where the useful insight is.

External complaint (customers) Internal cause (team) Rank
“My laptop request took three weeks” Hardware orders sit in a queue nobody owns 1
“I do not know where my request is” No shared view; status lives in people’s heads 2
“Urgent things jump the line” Everything marked urgent, so nothing is 3
“I was told 2 days and waited 6” Team starts new items before finishing old ones 4

Illustrative example. Ranking is by how often each complaint appears in the last 30 closed tickets.

Rank 4 points at the root problem, and the next two steps give it a number.

Steps 3 and 4: demand and capability in numbers

Count the arrivals by work item type for at least four weeks. Then count what the team finished. Use the Kanban Guide’s definitions: throughput is the number of items finished per unit of time, cycle time is the elapsed time from when an item starts to when it finishes, and work item age is the time since an unfinished item started (Kanban Guide, version 2025.5, updated May 1, 2025).

Demand against throughput, per week

Illustrative example: a six-person support team, averages over the last 8 weeks.

12963Demand: 30 a week24Throughput: 24 a weekGap: 6 items a weekThe queue grows by 6 every week.Access and passwordsHardware and softwareIncidentsOnboarding

Illustrative example, not real data. Throughput counts finished items, demand counts arriving requests.

Work type Arrivals a week Average cycle time (days) 85th percentile (days) Fitness target (step 1)
Access and passwords 12 3 6 2 days
Hardware and software 9 9 15 5 days
Incidents 6 6.5 11 3 days
Onboarding 3 12 20 Ready 2 days before start
All work 30 about 6.5

Illustrative example. The 85th percentile means 85% of finished items took that long or less.

Three facts fall out of this table. First, demand is 30 a week and the team finishes 24, so the queue grows by 6 a week. In 8 weeks the open backlog went from 40 to 88. Second, every type misses its target at the 85th percentile, so the complaints in step 2 are accurate. Third, 31 items are started and unfinished. Divide WIP by throughput and you get 31 ÷ 24 = 1.29 weeks, or about 6.5 working days, the same average the table shows. That relationship is Little’s Law, a standard result in queueing theory, and it explains why each person juggling five items makes everything slow. Read how to read a cumulative flow diagram to see the same gap as two diverging lines, and Kanban reports explained for the control chart that shows the 85th percentile.

Step 5: model the workflow

List the states an item passes through and where it waits. Do this from real tickets, not from the process document. The team pulls ten closed tickets of each type and writes down every status change. All four types share five states: Inbox (requested), Ready (triaged and picked as next), In progress, Waiting (for the user, a vendor or an order), and Verify (the requester confirms). Hardware items also spend a median 3 days in Waiting for an order; that single state explains much of the 9 day average.

The map also exposes a hidden decision: triage sits between Inbox and Ready and happens whenever someone feels like it. Step 7 turns it into a rule. The start point is a request logged in the tracker and the finish point is the requester’s confirmation.

Step 6: classes of service

A class of service groups work that deserves the same handling because delay costs the same. The four classes taught in Kanban courses are expedite, fixed delivery date, standard and intangible. The step asks which of your work items belong in which class, and what rule governs each one. The test is the cost of delay: what does waiting a day cost, and does the cost jump on a date?

Classes of service for the support team

Entry rule, pull order and limit rule for each class.

ClassEnters whenPull orderLimit ruleExpediteMany users cannot work1 at a timeBreaks the In progress limit by oneFixed dateOnboarding with a start datePulled by dateFinish 2 days before the startStandardAccess, hardware, incidentsFirst in, first outService level by typeIntangiblePatching, knowledge base fixesGets leftover slotsAt most 1 of 8 In progress slots

Illustrative example. The rules are design choices for this invented team.

The expedite rule solves complaint 3 from step 2. Because only one item at a time can be expedited, the team cannot call everything urgent. A production outage that blocks many users qualifies; a single user’s printer does not.

Step 7: design the Kanban system

Now the facts become a board. Every choice below traces back to a number from steps 3 to 6.

The board that comes out of steps 1 to 6

Five states from step 5, limits from the WIP decision below, and the expedite lane from step 6.

Inboxno limitReadylimit 8In progresslimit 8Waitinglimit 5Verifylimit 3DoneExpedite lane: 1 item at mostCards are anonymous squares here. In use, each card shows type, class of service and the day it started.The red edge marks a blocked item. Started-not-finished limit: 8 + 5 + 3 = 16.

Illustrative example. Limits are a starting hypothesis for the first trial, not a recommendation for your team.

Design choice Value in the example Reason from the earlier steps
In progress limit 8 Six people, about 1.3 items each, so people finish before starting
Waiting limit 5 Hardware orders wait for days; a limit makes the team chase them
Verify limit 3 Requesters confirm slowly; unconfirmed items stay visible instead of piling up
Ready limit 8 Holds the next picks only; the rest stays in the Inbox, outside the team’s WIP
Pull rule Pull from Ready only when In progress has a free slot Starting less than the team can finish ends the juggling in step 4
Triage rule Twice a day, 15 minutes Replaces the ad hoc triage found in step 5
Review cadences Daily 10 minute board walk, weekly replenishment, review at weeks 3 and 6 Gives the trial two decision points

For the method behind the limit numbers, read how to set WIP limits. For a blank layout with columns and a policy list, use the Kanban board template.

What the WIP limit changes, and what it does not

The new started-not-finished limit is 8 + 5 + 3 = 16. By Little’s Law, with throughput held at 24 a week, the average cycle time falls as WIP falls. The chart shows the arithmetic.

Average cycle time at different WIP levels (working days)

Illustrative example: WIP ÷ 24 items a week × 5 working days, throughput held constant.

Today: WIP 316.5 days
WIP 245.0 days
Trial limit: WIP 163.3 days
WIP 122.5 days

Throughput will not stay constant: it can drop if the limit is too tight, or rise as context switching falls. The trial tests the number.

A limit also does not touch the other half of the problem. Demand is 30 and capability is 24. If nothing else changes, the Inbox, which sits outside the limit, grows by 6 a week. The limit makes the delay honest: waiting moves out of the board into a visible queue. The team then has four options to put in front of its manager.

Option Demand a week Throughput a week Weekly gap Inbox growth over 6 weeks
Change nothing 30 24 +6 +36
Self-service password reset removes 5 requests 25 24 +1 +6
Add one person 30 28 +2 +12
Both of the above 25 28 -3 Queue shrinks
Accept longer service levels 30 24 +6 +36, but customers know the wait

Illustrative example. Adding one person is assumed to add four items a week, the current average per person. The 5 resets and the arithmetic are invented for the exercise.

Rule of thumb. If demand is above throughput, a WIP limit makes you decide where the wait lives. It cannot remove the wait. Bring the demand number to the person who can change demand or capacity.

Step 8: socialize the design and agree the trial

Step 8 is where a design becomes a commitment. The team presents steps 2 to 7 to the people who will live with the board: the IT manager, the service desk lead, and two requesters from other departments. It brings the numbers, not a finished decision. The agenda has four items.

  • Show the dissatisfaction list and the demand gap, so the room sees the same numbers.
  • Walk the board and the policies, and ask which one the manager would break first and why.
  • Agree the options for the demand gap and who owns each one.
  • Fix the trial: six weeks, reviews at weeks 3 and 6, and the three numbers read at each review (cycle time against the targets from step 1, throughput, and the oldest work item age).

At week 3 the team asks whether the limits are too tight or too loose. At week 6 it asks whether the targets from step 1 are met and whether the board has earned a second service. The Kanban Guide’s third practice, improving the workflow, is what the reviews do.

Mistakes that make STATIK sessions fail

Mistake What it causes Fix
Running it on several services at once A workflow map nobody can use One service, one customer group per session
Skipping real data in steps 3 and 4 Limits based on opinion Pull at least four weeks of tickets before the session
Leaving out the people who feel the pain A design that the customer rejects at step 8 Invite two requesters to step 2
Copying another team’s board Columns that do not match your states Take states from your own tickets in step 5

When STATIK is the wrong tool

A brand new team with no work history cannot do steps 3 and 4. It can run steps 1, 2 and 5, start a simple board, and return to demand and capability after a few weeks of real data. A team on one large fixed-scope project has little flow to measure.

Run STATIK with a facilitator

AgileFever sells the STATIK Workshop, a live virtual one-day course. As listed on November 18, 2026, the price is $600 or ₹10,999 before 18% GST for buyers in India. Kanban University lists no exam for it. If you manage a service desk, Kanban training for IT operations shows how the course fits a wider plan for support teams.

Additional discounts are available. Contact us to know more.

Questions people ask

What are the steps of STATIK?

David J. Anderson’s school lists eight: fit for purpose, sources of dissatisfaction, analyse demand, analyse capability, model the workflow, discover classes of service, design the Kanban system, and socialize the design. Kanban University’s own article says six basic steps. They describe the same sequence of discovery then design.

How long does a STATIK session take?

Kanban University describes its STATIK Workshop as one day. A real service takes longer if the team has no ticket history ready. A practical plan is a pre-work week to pull data, one session for steps 1 to 6, and a second session for the board and the launch plan.

What data do I need before running STATIK?

At least four weeks of closed work items with a start date, a finish date and a work type, plus a count of arrivals per week.

Does STATIK tell me my WIP limits?

No. It gives you the inputs: throughput, current WIP, cycle times and where work waits. You choose a starting limit from those, run a trial, and adjust at the review. The method behind the number is in our post on setting WIP limits.

Is STATIK part of the Kanban Guide?

No. Version 2025.5 of the Kanban Guide does not mention it. The Guide defines Kanban’s practices and flow measures, and STATIK is a separate method from the wider Kanban community for starting a system.

Can STATIK be used for a team that is not in IT?

Yes. The steps ask about customers, demand, capability and workflow, which any service has. Marketing, HR and operations teams run it the same way once they can count the items they receive and finish.

Contact Us

    By checking the box, you consent to receive registrations, class reminders, updates, support text messages from AgileFever at the provided number. Message and data rates may apply. Message frequency varies (typically 1–2 msgs/week). To end messaging from us, you may always reply with STOP. You may also reply with HELP for more information. Check Privacy Policy and Terms & Conditions.