scrum better with kanban

Scrum Better With Kanban (SBK): What Scrum Teams Gain

Table of Contents

Short answer. Scrum Better With Kanban means keeping Scrum’s roles, events and artifacts and adding four flow practices from the free Kanban Guide for Scrum Teams (Scrum.org, January 2021): visualize the workflow, limit work in progress (WIP), actively manage items in progress, and inspect and adapt your Definition of Workflow. The Guide adds no events. The Daily Scrum, Sprint Planning and the Retrospective use the board and four metrics instead: WIP, cycle time, work item age and throughput. AgileFever teaches Kanban University’s one-day Scrum Better With Kanban (SBK) class, listed on November 19, 2026 at $600 or ₹14,999 before 18% GST, next batch December 17, 2026.

Written by the AgileFever editorial team. Facts checked on November 19, 2026 against the official pages of the organizations named in this post. AgileFever sells training for some of the topics covered here, and we say so wherever it applies. The practices come from the Kanban Guide for Scrum Teams on Scrum.org, the Scrum Guide (November 2020) and Kanban University’s course page. AgileFever sells the SBK course discussed below. The examples with numbers are invented and labelled.

Most Scrum teams that look at Scrum Better With Kanban are not unhappy with Scrum. They have a narrower problem: items start early and finish on the last day, and the Sprint Review shows half-done work. Kanban practices target that problem. This post separates three similarly named things, shows where each practice lands in the Sprint, works one before and after example, and says who should leave Scrum alone.

Three things share the name, and only one is the Guide

Search for scrum better with kanban and you will find a free guide, a Scrum.org class and a Kanban University class, often described as one product. They are not.

Kanban Guide for Scrum Teams Professional Scrum with Kanban Scrum Better With Kanban (SBK)
Owner Scrum.org, with Daniel Vacanti and Yuval Yeret Scrum.org Kanban University, in partnership with Scrum Alliance
What it is A free guide, January 2021 edition, licensed Creative Commons Attribution-ShareAlike 4.0 A class plus an assessment, named on the Guide page, with a free Scrum with Kanban open assessment A one-day class (eight hours online), no prerequisites
Core content Four practices and four flow metrics Built on the Guide The six general practices of the Kanban Method and three change management principles

Sources: Scrum.org Kanban Guide for Scrum Teams page and online edition, Kanban University’s Scrum Better with Kanban page, AgileFever’s SBK course page. All read November 19, 2026.

The Guide is a minimal set of four practices written for teams that already run Scrum professionally. Yuval Yeret wrote on the Scrum.org blog that it describes Kanban differently from experienced Kanban practitioners on purpose, because it starts from a Scrum team. The SBK class teaches the wider Kanban Method and shows how it applies to your Scrum. For the principles-versus-practices split behind that, see Kanban principles vs Kanban practices.

What the Kanban Guide for Scrum Teams asks you to do

The Kanban Guide for Scrum Teams on Scrum.org defines Kanban as a strategy for optimizing the flow of value through a process that uses a visual, work-in-progress limited pull system. It states that it does not replace or change the Scrum Guide. The Scrum Guide itself calls Scrum purposefully incomplete, so there is room to add. The four practices, in the Guide’s own order:

The four practices in the Guide
1
Visualization of the workflow
Show start and finish points, work item definitions, states, policies and WIP limits on a board the whole team can read.
2
Limiting work in progress
Set an explicit WIP limit and keep to it. New work starts only when capacity frees up, which is what makes it a pull system.
3
Active management of work items in progress
Keep intake and output balanced, stop items aging, and react quickly to blocked or slow work, using a Service Level Expectation (SLE).
4
Inspecting and adapting the Definition of Workflow
The Definition of Workflow is the team’s shared set of policies for these practices. Use Scrum events, mainly the Retrospective, to change it.

Source: Kanban Guide for Scrum Teams, January 2021, Scrum.org, read November 19, 2026.

An SLE is a range of elapsed days with a probability, for example “85% of items finish within 8 days”. You build it from your own past cycle times. If you have no history yet, the Guide says to make a best guess and refine it later. The Definition of Workflow is created and changed by the Scrum Team’s own accountable roles. The Guide says no one outside the team should dictate it, which matters if a manager is the one asking for WIP limits.

The four flow metrics are WIP (items started and not finished), cycle time (elapsed time from start to finish), work item age (time since an unfinished item started) and throughput (items finished per unit of time). The Guide also cites Little’s Law: for a given throughput, more concurrent work means a longer average completion time. If cycle times are too long, lower WIP first. Our guide to setting WIP limits gives starting numbers for that step.

Where the practices land in each Scrum event

The Guide adds no events and says teams must still deliver value at least once per Sprint.

Scrum event What changes with Kanban practices
Sprint Planning The team looks at historical throughput to judge how many items fit, instead of only estimating points
Sprint (daily work) Developers pull the next item when a slot opens in the WIP limit, so work finishes before more starts
Daily Scrum Held around the board: blocked items, aging items, SLE or WIP limit breaches
Sprint Review Flow data supports talk about progress toward the Product Goal, for example throughput for the Product Owner’s forecast
Sprint Retrospective Adds cycle time, throughput and a cumulative flow diagram, and inspects the Definition of Workflow

Sources: Kanban Guide for Scrum Teams (January 2021) and the Scrum Guide (November 2020: Daily Scrum is 15 minutes, Sprints are one month or less), read November 19, 2026.

Two details are easy to overstate. First, the Guide mentions the Sprint Backlog and the Definition of Done only briefly and does not say where WIP limits must live, so showing them on the team’s board is a team choice. Second, the Guide does not say you may drop the Sprint Goal or pull anything into a Sprint at will. The Scrum Guide says no change may endanger the Sprint Goal, and that scope can be clarified and renegotiated with the Product Owner as the team learns more. Mid-sprint pulling means pulling the next agreed item when capacity frees up, not adding scope.

What a Sprint board looks like with WIP limits

A Scrum task board with To Do, Doing and Done lets every Developer start something on day one. A board with stage limits does not. In the illustrative example below, three items can be in Develop and two in Review at a time.

Sprint Backlogno limitItem AItem BItem CItem DDevelopWIP limit 3Item EItem FItem GReviewWIP limit 2Item IItem JTestWIP limit 2Item MDonethis SprintItem QItem RItem SItem TItems in progress: 3 + 2 + 1 = 6. Develop and Review are at their limits, so nobody starts a new item.Test has one free slot, so the next move is to pull an item from Review into Test, not to start a new item from the backlog.

Illustrative example, drawn by AgileFever. The limits are not recommendations for your team. Item letters are placeholders.

Read the board from right to left: look first at what can be finished. When Develop and Review are both full, a Developer who finishes a task helps with review instead of starting something new. That behavior is the point of the limit. To practice columns and policies first, try our personal Kanban setup on your own task list.

A before and after example with the numbers

Take an invented team of six Developers on ten-day Sprints. After the change, they hold six items in progress at most. The throughput stays at twelve items per Sprint in both cases, because the point is to show what moves when WIP falls.

Measure Before (no WIP limits) After (6 items in progress at most) How it is read
Average WIP 12 items 6 items Counted at each Daily Scrum
Throughput 12 items per Sprint (1.2 a day) 12 items per Sprint (1.2 a day) Items finished
Average cycle time 10 days (12 / 1.2) 5 days (6 / 1.2) Little’s Law: WIP divided by throughput
85% of items done within 14 days 8 days The team’s SLE, from past cycle times
Items carried into the next Sprint 4 1 Count at Sprint Review

Illustrative example. These numbers are invented to show the arithmetic and are not data from a real team. Little’s Law holds for averages when the system is stable.

Average cycle time in days, before and after

Illustrative example: same throughput, half the work in progress.

Before: 12 items in progress10 days
After: 6 items in progress5 days

Illustrative example, not real team data.

The lesson is the middle row of the table. The team did not get faster. It finished each item sooner after starting it, so more items fit inside the Sprint boundary and the 85% line (14 days before) fell below the length of a Sprint. An 85% line of 8 days means an item pulled on day 1 has about an 85% chance of finishing inside a ten-day Sprint, which a points estimate cannot tell you. For the charts behind these numbers, read Kanban reports explained and the cumulative flow diagram guide. To compute your own numbers from a list of start and finish dates, use AgileFever’s free flow metrics analyzer.

What Scrum Better With Kanban gives a Scrum team

  • Finished items, not busy people. The WIP limit changes the Daily Scrum from status talk to “what do we finish next”.
  • A forecast with a probability. Historical throughput and an SLE give a range, which is easier to defend at a Sprint Review than a velocity figure.
  • Earlier warnings. Work item age flags an item older than your SLE while it is still in progress. Cycle time only exists after the item finishes.
  • A better Retrospective. You bring a cumulative flow diagram and a list of aged items instead of memories of the last two weeks.
Honest limit. The Guide describes practices, not guaranteed results, and the numbers in this post are invented. Record two Sprints of baseline data before you change anything, then compare.

Where Kanban practices clash with Scrum

Clash Why it happens What to do
Velocity and story points vs throughput Velocity counts points, throughput counts finished items. Reporting both invites arguments about which is right Run both for two Sprints, then compare forecast accuracy. See Kanban velocity vs throughput
Sprint commitment vs pulling the next item Scrum fixes the Sprint Goal and selected items at planning. Pulling when capacity frees up can look like scope creep Pull only items already ordered on the Product Backlog and agreed with the Product Owner, and keep the Sprint Goal first
WIP limit vs assigned tasks If planning assigns every task to a named person on day one, nobody has room to swarm Assign at the Daily Scrum, not at planning, for items near the WIP limit
Command-and-control Scrum Yeret wrote that Kanban can conflict with Scrum used for task tracking, velocity and burndown instead of empiricism Fix the Scrum basics first. Kanban practices will not repair a team that does not inspect and adapt

Sources: Scrum Guide (November 2020); Kanban Guide for Scrum Teams (January 2021); Yuval Yeret, Scrum.org blog, March 14, 2018. Read November 19, 2026. The “What to do” column is AgileFever’s advice.

Stay with Scrum, add Kanban practices, or switch to Kanban

These three paths are different. Adding practices keeps the Sprint. Switching to Kanban removes it and replaces planning and review with continuous flow cadences. Teams that need that second step should read how to choose between Scrum and Kanban.

Your situation Stay with plain Scrum Add Kanban practices Switch to Kanban
Items finish inside the Sprint, goals are met, the team is calm Yes Not needed yet No
Many items start early and finish on the last day or carry over No Yes: WIP limits and work item age Not yet
Half the work is interrupt-driven support or operations tickets No Partly: add an expedite policy and a separate lane Yes, if no Sprint Goal makes sense
No one on the team sees a problem worth solving Yes No No

Illustrative decision table from AgileFever, not a rule from Scrum.org, Kanban University or the Scrum Guide.

Who should skip this

  • A team that is new to Scrum and has not yet run three Sprints with working events. Learn the base first.
  • A team that meets its Sprint Goal and carries nothing over. There is nothing to fix.
  • An organization that wants WIP limits as a management control. The Guide puts the Definition of Workflow with the team, and imposed limits get gamed.
  • Support and operations teams whose work arrives hourly and cannot wait for a Sprint. They need a Kanban system, not Scrum with extras. See the Kanban rollout plan if that is you.
  • People who want a credential for its own sake. The SBK class has no exam, so it will not give you a pass score to list.

The SBK class at AgileFever: content, price and batches

AgileFever delivers Kanban University’s Scrum Better With Kanban (SBK) class. Its page lists two modules. Module 1 covers the six general practices of the Kanban Method: visualize, limit work in progress, manage flow, make policies explicit, establish feedback loops, and improve collaboratively, evolve experimentally. Module 2 covers three change management principles: start where you are, agree to pursue evolutionary change, and act with leadership at all levels. The Guide’s four practices fold feedback loops and collaborative improvement into the Scrum events you already run, so the class gives you more of the Kanban Method and the Guide gives you the Scrum-first view.

No prior Kanban experience is required, and there is no exam. The page says you earn the SBK certificate by attending the whole session and completing the assignments. Kanban University’s own page says the class also leads to its certificate of class completion, the Scrum Kanban Practitioner credential and a Scrum Better with Kanban microcredential.

As listed on November 19, 2026, the price is $600 in the US store and ₹14,999 in the India store, before 18% GST. Buyers in India pay ₹17,699 at checkout after GST. The listed one-day batches are Thursday, December 17, 2026, then January 21, February 18 and March 18, 2027. US batches run 9:00 AM to 5:00 PM ET and India batches 6:30 PM to 2:30 AM IST.

Additional discounts are available. Contact us to know more.

Questions people ask

What is Scrum Better With Kanban?

It is a Kanban University class, taught in one day in person or eight hours online, that shows Scrum teams how to apply Kanban practices to their existing Scrum.

What are the four Kanban practices for Scrum teams?

Per the Kanban Guide for Scrum Teams (January 2021): visualization of the workflow, limiting work in progress, active management of work items in progress, and inspecting and adapting the team’s Definition of Workflow. The Guide adds no new events to Scrum.

Is Scrum Better With Kanban the same as Scrumban?

No. Scrumban has several meanings. The Guide keeps Scrum’s roles, events and artifacts intact. Yeret notes the word has several meanings, so ask which one someone intends before you agree to adopt it.

Does adding Kanban to Scrum remove the Sprint?

No. The Guide states teams must still deliver value at least once per Sprint and that Kanban adds no events. Dropping the Sprint is a different decision: switching to Kanban.

How should a Scrum team set WIP limits?

Start from what you see on the board. Count average items in progress over two Sprints, set the limit slightly below it, and tighten after two Sprints if cycle time stays high. Our WIP limits post has the arithmetic. The team, not management, sets the limit.

Do I need an exam to get the SBK certificate?

AgileFever’s page says there is no exam: you attend the full session and complete the assignments. Scrum.org’s Professional Scrum with Kanban path has its own assessment, so check which credential an employer names.

Contact Us

    By checking the box, you consent to receive registrations, class reminders, updates, support text messages from AgileFever at the provided number. Message and data rates may apply. Message frequency varies (typically 1–2 msgs/week). To end messaging from us, you may always reply with STOP. You may also reply with HELP for more information. Check Privacy Policy and Terms & Conditions.